Data centres
Busway, containment and cooling resolved in a ceiling with nothing left to give.
- LOD 400
- clash detection
- 4D sequencing
- prefab racks
Projects
Ten sectors, each with its own coordination problem. We have run jobs in all of them and built the teams that know them.
Busway, containment and cooling resolved in a ceiling with nothing left to give.
Process piping and gas routed to tolerance, months before the tool lands.
Services coordinated around casework and equipment that keeps changing late.
MEP-led coordination above a corridor ceiling that has to stay accessible for thirty years.
Phased work in an occupied building, sequenced around a semester that does not move.
Piping-heavy plant rooms where the spool has to be right before anything is fabricated.
Steel-led shells where the frame and the racking have to agree before either is ordered.
Complex geometry where nothing repeats and every service run is its own problem.
Staged handover, where each possession has to be complete on its own terms.
Repeat-floor work where one resolved level pays back across every floor above it.
Tell us what you are building and where the model is today. A VDC lead will come back with a straight answer on scope, fit and turnaround.
Talk to a VDC lead