| Zone | Conflict | Type | State | Trades |
|---|---|---|---|---|
| Level 03 | Duct vs. structural beam | Hard | Rerouted | MEP / Struct |
| Level 03 | Sprinkler main vs. duct | Hard | Rerouted | MEP / Fire |
| Level 04 | Cable tray clearance < 300mm | Clearance | Resolved | Elec / Struct |
| Level 04 | Beam penetration, unapproved | Hard | With engineer | Struct |
| Level 05 | Valve access < 600mm | Soft | Resolved | MEP |
| Level 05 | Hanger vs. cable tray | Hard | Rerouted | MEP / Elec |
| Level 06 | Duct vs. ceiling zone | Soft | Resolved | MEP / Arch |
| Level 06 | Riser offset, out of tolerance | Hard | With trade | MEP |
| Level 07 | Drainage fall vs. slab | Hard | Rerouted | MEP / Struct |

NeevIQ is the VDC bench for self-perform general contractors — takeoff inside your bid window, clashes closed before they reach your own crews, and steel detailing that never blocks the critical path.
We work in your stack
Three loads a self-perform GC carries that we take over. Every output traces to the element in the model that produced it.

Material takeoff can consume up to half the bid cycle when it is done by hand — Construction Dive's number, cited in NeevIQ's own market research. We extract quantities from the model, mapped to your cost codes.
A self-perform GC's estimating load is double a management GC's: your own labour and materials, plus every sub package. We carry the measuring so your team prices.
GCs turn down work they could win because the takeoff cannot be finished inside the window. Send us the bid set; your estimators get the week back.

For a management GC a coordination failure is a difficult conversation. For you it is your concrete crew standing down. We resolve clashes with the trade that owns them, before award.
FMI puts industry rework at $31B a year, and Dodge found poor trade coordination erodes around 10% of annual contractor margin. On a $200M book that is $2–4M.
A clash report is homework someone still has to do. We deliver the resolved model, approved by the trades, with every decision recorded against its element.

US steel detailing talent is scarce and expensive. Our Tekla team details to LOD 350–400, to your shop standards.
Production-ready detailing your engineer of record reviews and approves. We never stamp — the EOR stays the EOR.
Approved drawings drive fabrication and erection dates. Late drawings ARE the critical path; ours land on the fabrication schedule.
One bid set or one coordination package, on a live job
Your standards captured: cost codes, BEP, naming, LOD
We run takeoff, coordination and detailing on your calendar
Everything lands traceable, in your formats and your CDE

Start with one live job — a takeoff in a bid window, or one coordination cycle.
You keep the sign-off, the client relationship and the coordination call. We carry the modelling, clash resolution and detailing load — in ACC or BIM 360, under your naming, in your folder structure.
Takeoff, coordinate, detail, hand over
Every decision recorded against its element.
ACC / BIM 360, your naming, your folders.
Pre-construction, Construction, Fabrication, Operations.
The model is yours; the EOR stays yours.