| Spool | Description | Size | Length mm | Source object |
|---|---|---|---|---|
| SP-03-014 | CHW supply, 150mm | 150 | 4,820 | Pipe: CHW-S-150 |
| SP-03-015 | CHW return, 150mm | 150 | 4,640 | Pipe: CHW-R-150 |
| SP-03-022 | Condenser water riser | 200 | 6,100 | Pipe: CW-R-200 |
| SP-04-007 | Supply duct, rect. | 600×400 | 3,200 | Duct: SA-R-600 |
| SP-04-011 | Sprinkler main | 100 | 5,400 | Pipe: FP-M-100 |
| SP-05-003 | Hanger run, trapeze | — | 2,750 | Support: TR-05 |
| SP-05-009 | Extract duct, spiral | 400 | 3,980 | Duct: EA-S-400 |
| SP-06-001 | Steam header | 80 | 2,410 | Pipe: ST-H-080 |
| SP-06-004 | Chilled beam branch | 50 | 1,860 | Pipe: CB-B-050 |

NeevIQ is the BIM bench for MEP subs — coordination models on the GC's calendar, clashes closed in the round they are assigned, and spools back in days instead of weeks.
We work in your stack
Three loads an MEP sub carries that we take over — across mechanical, electrical, plumbing and fire protection.

The GC assigns model areas and deadlines; miss one and the whole cycle stalls with your name on it. We model your systems and submit on their calendar.
Assigned clashes are resolved in the model — routing and clearances reworked — not marked up in 2D and argued in the coordination meeting.
Under roughly $200M, most subs have PMs and estimators covering BIM work they were never hired for. They get their actual jobs back.

Domestic detailers are backlogged and one queue can put a project schedule at risk — NeevIQ's own market research puts common turnarounds at 4–6 weeks. We produce from the coordinated model in days.
Spool drawings and isometrics for mechanical and plumbing; conduit layouts, cable tray and panel schedules for electrical.
Drawings gate fabrication, fabrication gates material buys, buys gate the field. Days recovered at the top recover the chain.

A conflict found in coordination costs a re-route. The same conflict found on site costs tear-out, delay and a harder conversation with the GC.
Subs that hit coordination dates get invited to the next bid. Subs that miss them stop being invited — that is the market's own arithmetic.
Every resolution is recorded against the element, so 'who moved this duct' always has an answer.
One project's coordination scope — your systems, the GC's calendar
Your standards captured: naming, LOD, tolerances, spool formats
We model, resolve and submit every round; you review first
Approved model becomes spools, isometrics and schedules

Hand us one live project's coordination scope — mid-stream is fine.
We model your systems to your standards and submit into the GC's federated environment on their schedule. Mechanical, electrical, plumbing and fire protection — one team across all your systems.
Model, resolve, submit, fabricate
Every resolution recorded against its element.
HVAC, piping, electrical, plumbing, fire.
Pre-construction, Construction, Fabrication, Operations.
Spools, isos and cut lists in your formats.